Charging builders

Charging builders are also facing problems caused by the raising demand for electric vehicles. The most obvious one is insufficient capacity of the existing power grids. Many spots both inside and outside cities are simply not designed to stand the scope of energy demand.

Besides, construction of charging stations and connecting them to power grid is problematic, being too time-consuming. L-Charge is the perfect solution. The company's charging stations may be installed independently of the power grid, which allows to expand the choice of their operation locations significantly. Installation takes 1 day, stations not requiring any operator maintenance. Apart from that, L-Charge EV-charging stations can withstand insufficient capacity of power grids, allowing to choose the required charge power of up to 2000 kW/ hour.

PRODUCTS

Contact us