Temporary Fast EV Charging: Tower Mobility Success

As the transition to electric mobility accelerates, fleet operators face a common challenge: charging infrastructure takes years to install, while fleet growth needs to happen now. That’s where temporary fast EV charging comes in. L-Charge provides ultra-fast, off-grid charging solutions that can be deployed in weeks, not years. A recent use case with Tower Mobility, a leading ride-sharing fleet in Los Angeles, demonstrates how temporary charging can unlock rapid, cost-effective fleet expansion.
Tower Mobility set an ambitious goal: grow its ride-sharing fleet from 50 to 400 Tesla vehicles in a year. The problem? Public charging was slow and unreliable, charging depot charging was ineffective, and waiting for grid-tied infrastructure would take years of permits, construction, and investment. For a business built on high vehicle availability, downtime at charging stations wasn’t an option.
Instead of waiting for the grid, Tower Mobility turned to temporary fast EV charging from L-Charge. Gradually, L-Charge deployed 20 charging stalls at Tower’s own charging depot, powered entirely off-grid by natural gas. Each stall delivers 180 kW DC fast charging enough to recharge a Tesla and send it back on the road in minutes!
Key benefits for Tower Mobility included:
Thanks to temporary fast EV charging, Tower Mobility expanded its fleet eight-fold in record time. Today, 400 Tesla vehicles serve riders across Los Angeles, powered daily by L-Charge’s mobile fast chargers. What could have been a bottleneck became a growth enabler.
“With L-Charge, we were able to scale much faster. So from having a 50 vehicle fleet, we went to close to a 400 vehicle fleet at a very fast pace, because L-Charge were able to provide us with a charging solution that is scalable. “ Sai Bathal, General Manager, Tower Mobility
Tower Mobility’s success illustrates a growing industry trend: fleets can’t wait for the grid. Temporary fast EV charging that is also CARB, EPA & SCAQMD compliant is the bridge that keeps vehicles moving while long-term infrastructure is planned. Whether for ride-sharing, logistics, construction, or municipal fleets, L-Charge enables:
For Tower Mobility, temporary fast charging wasn’t just a stopgap it was the foundation of growth. By partnering with L-Charge, they electrified a 400-vehicle fleet in months, not years, and proved that fast, flexible charging is the key to fleet electrification at scale.
What is temporary fast EV charging?
Temporary fast EV charging provides DC fast charging using mobile or off-grid power sources. It’s designed for rapid deployment and scalability without waiting for a utility connection.
Who needs it?
Fleets expanding faster than grid upgrades, companies on leased premises, or any operator needing instant charging capacity.
Is it sustainable?
Yes. L-Charge units run on natural gas or renewable natural gas (RNG), reducing emissions by up to 43% compared to diesel and alternative new fuels such as flare gas can even be carbon-negative.